Skip to content

The maintenance gap: why body corporates pay twice

A small maintenance problem rarely stays small. When a body corporate waits for failure, it pays once for the damage and again for the disruption around it.

In short: Why do body corporates pay twice for maintenance?

I argue that body corporates pay twice when they defer maintenance: first through damage and then through disruption, urgent procurement and repeat work. A useful plan records major assets, condition, timing, estimated costs and expected life, and assigns an owner to each next action.

Updated

By Hannes Dupper · · 5 min read

I’ve seen how quickly a manageable building issue becomes an argument, an emergency and an avoidable expense. A leak spreads. A gate stops working. A pump fails. The first question is often, ‘Who can fix it now?’ The better question was asked months earlier: ‘What did we know, and what did we decide?’

Through Dev 360, I work with body corporates, property owners and businesses on practical problems, including maintenance and intervention. The Preferred Participation Panel, or PPP, supports this work with vetted businesses and professionals. The PPP is not a substitute for trustees’ decisions. It helps make the route from decision to competent action clearer.

The cost of waiting

Reactive maintenance feels decisive because the fault is visible. People can point to the broken item and approve an urgent response. The hidden cost sits elsewhere: disrupted residents, rushed procurement, repeat call-outs, damage to connected systems and time taken from trustees and managing agents.

Planned maintenance feels less urgent because nothing is visibly wrong at the moment. That makes it easy to defer. But a building is a system. Roofs, waterproofing, electrical equipment, pumps, drainage, security and common areas age whether a meeting discusses them or not.

The South African Government’s Sectional Titles Schemes Management Act 8 of 2011 places duties on bodies corporate to maintain common property (South African Government, 2011) and keep it in good and serviceable repair. The prescribed maintenance, repair and replacement plan requires major capital items expected to need attention within the next 10 years, their condition, timing, estimated cost and expected life to be recorded, as the Community Schemes Ombud Service regulations explain (CSOS, 2016). That is a planning discipline, not a filing exercise.

When the plan is ignored, the scheme loses time. Trustees are forced to decide under pressure, with less information and fewer choices.

A plan needs a decision

A maintenance plan only helps when it changes what people do. Trustees need to review the condition of assets, agree priorities, assign owners and record the next decision.

I’d start with a simple register. List the asset. Describe its condition. Note the last inspection. Record the likely intervention. Identify the person responsible for the next step. Add the date when the matter returns to the agenda. A list without an owner is a diary of future frustration.

The plan should also distinguish routine work from major repair and replacement. It should show dependencies. A roof issue may affect interiors. A failing pump may affect water systems. A security repair may require access, power and contractor coordination. Seeing those connections helps a body corporate avoid solving one symptom while leaving the system exposed.

Trustees don’t need to be technical specialists. They do need enough information to ask good questions and to recognise when a quote describes a repair without explaining the cause.

Choose contractors for the job

The cheapest urgent response is not always the most economical decision. A contractor needs the right capability, clear scope, insurance and a record of what was found and done.

That is where a vetted panel can help. Dev 360’s PPP gives body corporates a structured route to businesses and professionals who can be considered for the work. The panel does not remove the need for trustees to compare scope, check references and approve a decision. It makes the search less improvised.

A good brief names the fault, the location, the access conditions, the required deliverable and the evidence expected at completion. Ask for photographs, test results or a short close-out note when those records will help future decisions. Maintenance is easier when the building keeps its memory.

Trustees should also ask who will coordinate the work. A technically good contractor can still create disruption if residents, access, safety and follow-up are left to chance.

Close the loop

Every maintenance job should end with more knowledge than the scheme had at the start. What failed? Was the cause found? Was the repair temporary or durable? What needs watching? What should change in the plan?

This is where planned and reactive work meet. A reactive call-out can become useful evidence if someone records it and updates the maintenance plan. Without that loop, the same fault returns as a new emergency and the scheme pays twice again.

Communication matters as much as the technical work. Residents need a clear explanation of what is happening, what access is needed and what has been completed. Trustees need a record that supports the next decision. Contractors need a scope that prevents disagreement at the end.

Good maintenance does not make a building invisible. It makes decisions calmer, records clearer and failures less surprising.

A practical Dev 360 route

My approach is to bring four pieces together: a view of the current condition, a plan for future work, a decision process trustees can follow and access to vetted contractors through the PPP.

That route is deliberately ordinary. Inspect. Record. Prioritise. Approve. Brief. Complete. Review. The value is in doing the steps consistently, not in creating a complicated system that nobody uses.

A body corporate can start with one asset class and learn from it. The important thing is to make ownership visible and to keep the plan alive at every meeting where maintenance decisions are made.

Ask five questions. Which common-property item is closest to failure? What does the maintenance plan say about it? Who owns the next inspection or quote? How will trustees know the work solved the cause? Where will the close-out record be kept?

The maintenance gap closes when a scheme stops treating every fault as a surprise. Planned decisions protect buildings, reduce disruption and give trustees a better basis for action.

Figures are quoted as published by the sources below, with their dates.

Questions people ask

Why do body corporates pay twice for maintenance?

They pay first for the emergency response and again through disruption, repeat call-outs, damage and rushed decisions. A current maintenance plan, clear priorities and competent contractors help shift work from crisis response to planned action.

What must a South African body corporate maintenance plan include?

The prescribed plan records major capital items expected to need work within the next 10 years, their condition, timing, estimated cost and expected life. Trustees must also report how the approved plan has been implemented.

The cause sits in the joins between things.

Bring Blind Inspiration to your stage.

Book a talk

Keep reading

Related across the Dev 360 family

Get in touch